Data Centers in Oklahoma

10 data centers mapped in Oklahoma: 10 buildings covering about 13 acres of roof. The most are in Tulsa County (7). Most sit in EPA's Oklahoma/Texas Panhandle grid region, whose electricity is 46% natural gas, 33% wind and 16% coal, at 871 lb of CO₂ per megawatt-hour, 14% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites10mapped data centers
Buildings10mapped footprints
Roof area13 acbuilding footprints
Counties4with a data center

Map of data centers in Oklahoma

Data centerUnder construction

What powers Oklahoma's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Oklahoma's data centers sit in, and what those regions generate:

Oklahoma/Texas Panhandle · 10 sites

871 lb CO₂ per MWh, 14% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 46%Wind 33%Coal 16%Hydroelectric 3%

Share of electricity generated in EPA's Oklahoma/Texas Panhandle grid region (SPSO) in 2023, from eGRID. 158 TWh from 274 plants.

All power plants in Oklahoma →

By county

Operators

Choctaw Nation of oklahoma (1) · TierPoint (1)

Every mapped data center in Oklahoma

Data centerOperatorCity · CountyRoof area
Cherokee Data CenterOperator not recordedTulsa · Tulsa9.5 ac
Data center, RentiesvilleOperator not recordedRentiesville · Muskogee2.6 ac
TierPoint data center, TulsaTierPointTulsa · Tulsa0.4 ac
Choctaw Nation of Oklahoma Data CenterChoctaw Nation of oklahomaDurant · Bryan0.3 ac
Data center, 10920 East 56th Street South, TulsaOperator not recordedTulsa · Tulsa0.2 ac
Rack59 Data CenterOperator not recordedOklahoma CIty · Oklahoma—
TulsaConnect DC3Operator not recordedTulsa · Tulsa—
TulsaConnectOperator not recordedTulsa · Tulsa—
WindstreamOperator not recordedTulsa · Tulsa—
OCOSAOperator not recordedTulsa · Tulsa—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me