7 data centers are mapped in Tulsa County, Oklahoma: 7 buildings covering about 10.1 acres (440,000 sq ft) of roof. Operators include TierPoint. The county is in EPA's Oklahoma/Texas Panhandle grid region, whose electricity is 46% natural gas, 33% wind and 16% coal, at 871 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Cherokee Data Center | Tulsa | 9.5 ac |
| TierPoint data center, Tulsa | Tulsa | 0.4 ac |
| Data center, 10920 East 56th Street South, Tulsa | Tulsa | 0.2 ac |
| TulsaConnect DC3 | Tulsa | — |
| TulsaConnect | Tulsa | — |
| Windstream | Tulsa | — |
| OCOSA | Tulsa | — |
Data centers in Tulsa County draw from the regional grid. In 2023, electricity in EPA's Oklahoma/Texas Panhandle region was 46% natural gas, 33% wind and 16% coal, at 871 lb of CO₂ per megawatt-hour, 14% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Oklahoma/Texas Panhandle grid region (SPSO) in 2023, from eGRID. 158 TWh from 274 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Oklahoma Gas & Electric Co | 8.0¢ | 5.5¢ |
| Public Service Co of Oklahoma | 8.8¢ | 6.0¢ |
| Verdigris Valley Elec Coop Inc | 12.4¢ | 10.1¢ |
| East Central Oklahoma Elec Coop Inc | 9.7¢ | — |
| Indian Electric Coop, Inc | 10.8¢ | 6.9¢ |
Utilities that report serving Tulsa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Riverside (OK) | Natural Gas | 1,122 MW |
| Green Country Power Station | Natural Gas | 904 MW |
| Tulsa | Natural Gas | 348 MW |
| Keystone Dam | Hydroelectric | 70.0 MW |
| Reworld Tulsa | Biomass | 16.8 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.