Data Centers in District of Columbia

1 data center mapped in District of Columbia: 1 building covering about 1 acres of roof. Most sit in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).

Sites1mapped data centers
Buildings1mapped footprints
Roof area—building footprints
Counties1with a data center

Map of data centers in District of Columbia

Data centerUnder construction

What powers District of Columbia's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions District of Columbia's data centers sit in, and what those regions generate:

Mid-Atlantic · 1 site

594 lb CO₂ per MWh, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

All power plants in District of Columbia →

By county

Every mapped data center in District of Columbia

Data centerOperatorCity · CountyRoof area
CoreSite DC1CoreSiteWashington · District of Columbia—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.