Data Centers in Kentucky

5 data centers mapped in Kentucky: 5 buildings covering about 5 acres of roof. The most are in Jefferson County (2). Most sit in EPA's Tennessee Valley grid region, whose electricity is 33% nuclear, 30% natural gas and 28% coal, at 895 lb of CO₂ per megawatt-hour, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites5mapped data centers
Buildings5mapped footprints
Roof area5.2 acbuilding footprints
Counties4with a data center

Map of data centers in Kentucky

Data centerUnder construction

What powers Kentucky's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Kentucky's data centers sit in, and what those regions generate:

Tennessee Valley · 3 sites

895 lb CO₂ per MWh, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Ohio Valley · 2 sites

911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

All power plants in Kentucky →

By county

Operators

Flexential (2) · CyrusOne (1)

Every mapped data center in Kentucky

Data centerOperatorCity · CountyRoof area
CIN6CyrusOneFlorence · Boone3.2 ac
Flexential Louisville - DowntownFlexentialLouisville · Jefferson0.8 ac
Flexential Louisville - EastFlexentialLouisville · Jefferson0.8 ac
East Kentucky Network DatacenterOperator not recordedIvel · Floyd0.4 ac
Dynamics MiningOperator not recordedManitou · Hopkins—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me