6 data centers mapped in Kansas: 7 buildings covering about 8 acres of roof. The most are in Johnson County (4). Most sit in EPA's Kansas/Missouri grid region, whose electricity is 40% wind, 32% coal and 14% nuclear, at 861 lb of CO₂ per megawatt-hour, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Kansas's data centers sit in, and what those regions generate:
861 lb CO₂ per MWh, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Kansas/Missouri grid region (SPNO) in 2023, from eGRID. 73.5 TWh from 203 plants.
SC (1) · TierPoint (1)
| Data center | City · County | Roof area |
|---|---|---|
| U.S. Bank National Data Process Center | Olathe · Johnson | 3.7 ac |
| Data center, 23800 West Valley Parkway, Olathe | Olathe · Johnson | 2.0 ac |
| TierPoint data center, Lenexa | Lenexa · Johnson | 1.3 ac |
| Data Center Lenexa | Lenexa · Johnson | 1.1 ac |
| Cloud Storage Corp | Hays · Ellis | 0.3 ac |
| SC data center, 215 South Iliff Street, Medicine Lodge | Medicine Lodge · Barber | 0.0 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.