U.S. Bank National Data Process Center is a data center in Olathe, Johnson County, Kansas. It is mapped as 1 building covering about 3.7 acres (161,000 sq ft). Its power comes off the Kansas/Missouri grid (Southwest Power Pool), which runs on 40% wind, 32% coal and 14% nuclear.
This data centerOther data centersPower plants (colored by fuel)
| Address | 24101 West Valley Parkway, Olathe KS 66061 |
|---|---|
| County | Johnson County, Kansas |
| Coordinates | 38.93593, -94.86474 |
| On OpenStreetMap | way/598263496 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Kansas/Missouri grid region, and the county's largest utility is on the Southwest Power Pool grid. In 2023, the region's electricity was 40% wind, 32% coal, 14% nuclear and 14% natural gas.
Each megawatt-hour carried about 861 lb of CO₂, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Kansas/Missouri grid region (SPNO) in 2023, from eGRID. 73.5 TWh from 203 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Evergy Kansas Central, Inc | 11.0¢ | 9.1¢ |
| Evergy Metro | 10.7¢ | 9.8¢ |
Utilities that report serving Johnson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Gardner Energy Center | Natural Gas | 39.2 MW | 7.4 mi |
| West Gardner | Natural Gas | 408 MW | 12.2 mi |
| KCP&L SmartGrid Innovation Park | Other Fossil | 1.0 MW | 17.3 mi |
| BPU Solar Farm | Solar | 1.0 MW | 18.3 mi |
| Nearman Creek | Coal | 365 MW | 18.4 mi |
| Quindaro | Oil | 144 MW | 19.1 mi |
| Grand Ave Plant | Natural Gas | 5.0 MW | 19.5 mi |
| Kansas River Project | Hydroelectric | 7.0 MW | 20.1 mi |
| Baldwin City Plant No 1 | Oil | 4.2 MW | 20.6 mi |
| Northeast (MO) | Oil | 540 MW | 20.8 mi |
The largest power plant within 50 miles is Iatan, a 1,754 MW coal plant 36 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Data center, 23800 West Valley Parkway, Olathe | 2.0 ac | 0.3 mi |
Data centers in Kansas · Data centers in Johnson County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.