Data Centers in Johnson County, KS

4 data centers are mapped in Johnson County, Kansas: 5 buildings covering about 8.1 acres (354,000 sq ft) of roof. Operators include TierPoint. The county is in EPA's Kansas/Missouri grid region, whose electricity is 40% wind, 32% coal and 14% nuclear, at 861 lb of CO₂ per megawatt-hour.

Sites4mapped data centers
Buildings5mapped footprints
Roof area8.1 acbuilding footprints
GridSouthwest Power Poollargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Johnson County

Data centerOperatorCityRoof area
U.S. Bank National Data Process CenterOperator not recordedOlathe3.7 ac
Data center, 23800 West Valley Parkway, OlatheOperator not recordedOlathe2.0 ac
TierPoint data center, LenexaTierPointLenexa1.3 ac
Data Center LenexaOperator not recordedLenexa1.1 ac

What the grid here generates

Data centers in Johnson County draw from the regional grid. In 2023, electricity in EPA's Kansas/Missouri region was 40% wind, 32% coal, 14% nuclear and 14% natural gas, at 861 lb of CO₂ per megawatt-hour, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 40%Coal 32%Nuclear 14%Natural Gas 14%

Share of electricity generated in EPA's Kansas/Missouri grid region (SPNO) in 2023, from eGRID. 73.5 TWh from 203 plants.

Utilities that serve Johnson County

UtilityTypeGridBusiness rateIndustrial rate
Evergy Kansas Central, IncInvestor OwnedSouthwest Power Pool11.0¢9.1¢
Evergy MetroInvestor OwnedSouthwest Power Pool10.7¢9.8¢

Utilities that report serving Johnson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Johnson County

PlantFuelCapacity
West GardnerNatural Gas408 MW
Gardner Energy CenterNatural Gas39.2 MW

All power plants in Johnson County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me