xAI Macrohard Colossus 2 is a data center in Memphis, Shelby County, Tennessee. It is mapped as 1 building covering about 22.0 acres (957,000 sq ft). Its power comes off the Tennessee Valley grid (Tennessee Valley Authority), which runs on 33% nuclear, 30% natural gas and 28% coal.

OperatorxAIas mapped
Roof area22 ac1 building
Grid CO₂895 lbper MWh, SRTV region
Nearest plant0.4 miTVA Southaven Combined Cy…

Location

This data centerOther data centersPower plants (colored by fuel)

Address5420 Tulane Road, Memphis TN 38671
CountyShelby County, Tennessee
Coordinates34.99844, -90.03467
On OpenStreetMapway/1386926534

What powers xAI Macrohard Colossus 2

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Tennessee Valley grid region, and the county's largest utility is on the Tennessee Valley Authority grid. In 2023, the region's electricity was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric.

Each megawatt-hour carried about 895 lb of CO₂, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Shelby County

UtilityTypeGridBusiness rateIndustrial rate
City of Memphis - (TN)MunicipalTennessee Valley Authority12.0¢7.1¢

Utilities that report serving Shelby County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
TVA Southaven Combined CycleNatural Gas904 MW0.4 mi
AllenNatural Gas1,290 MW8.3 mi
Wildflower Solar, LLC (MS)Solar100 MW8.8 mi
IKEA Memphis 508Solar1.1 MW18.8 mi
West Memphis Solar StationSolar180 MW19.1 mi
SR West Marshall, LLCSolar4.8 MW19.1 mi
SR Innovation - NIKE PVSolar1.5 MW21.2 mi
Sr Byhalia, LLCSolar4.8 MW22.9 mi
Graceland Solar, LLCSolar150 MW23.5 mi
SR Canadaville, LLCSolar16.0 MW25.6 mi

The largest power plant within 50 miles is Allen, a 1,290 MW natural gas plant 8 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
xAI MacrohardrrxAI19 ac0.3 mi

More

Data centers in Tennessee · Data centers in Shelby County · All xAI data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me