Data Centers in Shelby County, TN

2 data centers are mapped in Shelby County, Tennessee: 2 buildings covering about 40.2 acres (1,751,000 sq ft) of roof. Operators include xAI. The county is in EPA's Tennessee Valley grid region, whose electricity is 33% nuclear, 30% natural gas and 28% coal, at 895 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area40 acbuilding footprints
GridTennessee Valley Authoritylargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Shelby County

Data centerOperatorCityRoof area
xAI Macrohard Colossus 2xAIMemphis22 ac
xAI ColossusxAIMemphis18 ac

What the grid here generates

Data centers in Shelby County draw from the regional grid. In 2023, electricity in EPA's Tennessee Valley region was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric, at 895 lb of CO₂ per megawatt-hour, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Shelby County

UtilityTypeGridBusiness rateIndustrial rate
City of Memphis - (TN)MunicipalTennessee Valley Authority12.0¢7.1¢

Utilities that report serving Shelby County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Shelby County

PlantFuelCapacity
AllenNatural Gas1,290 MW
Graceland Solar, LLCSolar150 MW
SR Millington IISolar74.9 MW
Millington Solar FarmSolar53.0 MW
SR Innovation - NIKE PVSolar1.5 MW
IKEA Memphis 508Solar1.1 MW

All power plants in Shelby County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me