Sr Millington Ii is a solar power plant in Tennessee.
| Plant Name | Sr Millington Ii |
|---|---|
| Operator | Sr Millington Ii, Llc |
| City | Millington |
| County | Shelby County |
| State | Tennessee |
| ZIP | 38053 |
| Coordinates | 35.35828, -89.84577 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| MILL2 | Solar Photovoltaic | Solar | 74.9 MW | Regulatory | — |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Tennessee Valley Authority |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.