Data Centers in South Carolina

8 data centers mapped in South Carolina: 15 buildings covering about 51 acres of roof. The most are in Berkeley County (3). Most sit in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).

Sites8mapped data centers
Buildings15mapped footprints
Roof area51 acbuilding footprints
Counties6with a data center

Map of data centers in South Carolina

Data centerUnder construction

What powers South Carolina's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions South Carolina's data centers sit in, and what those regions generate:

Virginia/Carolinas · 8 sites

590 lb CO₂ per MWh, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

All power plants in South Carolina →

By county

Operators

DartPoints (4) · Google (3)

Every mapped data center in South Carolina

Data centerOperatorCity · CountyRoof area
Google data center, Goose CreekGoogleGoose Creek · Berkeley44 ac
Google data center, Goose CreekGoogleGoose Creek · Berkeley4.2 ac
DC BLOX Myrtle Beach Cable Landing StationOperator not recordedMyrtle Beach · Horry2.1 ac
DartPoints CharlestonDartPointsLadson · Charleston0.3 ac
DartPoints SpartanburgDartPointsSpartanburg · Spartanburg0.3 ac
Google Berkeley County Data CenterGoogleGoose Creek · Berkeley—
DartPoints GreenvilleDartPointsGreenville · Greenville—
DartPoints ColumbiaDartPointsColumbia · Richland—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me