DartPoints Charleston is a data center in Ladson, Charleston County, South Carolina. It is mapped as 1 building covering about 14,100 sq ft. Its power comes off the Virginia/Carolinas grid (Dominion Energy South Carolina), which runs on 40% nuclear, 39% natural gas and 10% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 8480 Palmetto Commerce Parkway, Ladson SC 29456 |
|---|---|
| County | Charleston County, South Carolina |
| Coordinates | 32.96491, -80.10119 |
| Website | dartpoints.com/locations/chs01-charleston-sc/ |
| On OpenStreetMap | way/648154126 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the Dominion Energy South Carolina grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.
Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Dominion Energy South Carolina, Inc | 11.7¢ | 7.4¢ |
| Berkeley Electric Coop Inc | 7.1¢ | 10.2¢ |
Utilities that report serving Charleston County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Bushy Park Combustion Turbine Facility | Natural Gas | 65.4 MW | 10.5 mi |
| Williams | Coal | 660 MW | 10.5 mi |
| Berkeley County Landfill | Biomass | 3.2 MW | 11.6 mi |
| Hagood | Natural Gas | 177 MW | 12.5 mi |
| Omtanke Solar | Solar | 6.0 MW | 14.6 mi |
| Jefferies | Hydroelectric | 145 MW | 20.3 mi |
| Dorchester Biomass | Biomass | 22.5 MW | 27.7 mi |
| Cross | Coal | 2,452 MW | 28.1 mi |
| St Stephen | Hydroelectric | 84.0 MW | 33.4 mi |
| Spillway | Hydroelectric | 2.0 MW | 34.0 mi |
The largest power plant within 50 miles is Cross, a 2,452 MW coal plant 28 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
Data centers in South Carolina · All DartPoints data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.