Google data center, Goose Creek

Google data center, Goose Creek is a data center in Goose Creek, Berkeley County, South Carolina. It is mapped as 1 building covering about 4.2 acres (182,000 sq ft). Its power comes off the Virginia/Carolinas grid (Dominion Energy South Carolina), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorGoogleas mapped
Roof area4.2 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant4.1 miBerkeley County Landfill

Location

This data centerOther data centersPower plants (colored by fuel)

CountyBerkeley County, South Carolina
Coordinates33.06199, -80.03843
On OpenStreetMapway/1069388067

What powers Google data center, Goose Creek

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the Dominion Energy South Carolina grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Berkeley County

UtilityTypeGridBusiness rateIndustrial rate
Dominion Energy South Carolina, IncInvestor OwnedDominion Energy South Carolina11.7¢7.4¢
South Carolina Public Service AuthorityStateSantee Cooper9.4¢5.1¢
Berkeley Electric Coop IncCooperativeSantee Cooper7.1¢10.2¢
Edisto Electric Coop, IncCooperativeSantee Cooper18.2¢10.9¢

Utilities that report serving Berkeley County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Berkeley County LandfillBiomass3.2 MW4.1 mi
WilliamsCoal660 MW7.1 mi
Bushy Park Combustion Turbine FacilityNatural Gas65.4 MW7.1 mi
JefferiesHydroelectric145 MW12.9 mi
Omtanke SolarSolar6.0 MW13.4 mi
HagoodNatural Gas177 MW16.8 mi
CrossCoal2,452 MW21.8 mi
St StephenHydroelectric84.0 MW25.9 mi
Dorchester BiomassBiomass22.5 MW26.8 mi
SpillwayHydroelectric2.0 MW28.0 mi

The largest power plant within 50 miles is Cross, a 2,452 MW coal plant 22 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Google data center, Goose CreekGoogle44 ac0.3 mi
Google Berkeley County Data CenterGoogle—0.4 mi

More

Data centers in South Carolina · Data centers in Berkeley County · All Google data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me