Google data center, Council Bluffs

Google data center, Council Bluffs is a data center in Council Bluffs, Pottawattamie County, Iowa. It is mapped as 18 buildings covering about 73.7 acres (3,212,000 sq ft). Its power comes off the Upper Midwest grid (MISO (Midcontinent ISO)), which runs on 38% wind, 35% coal and 13% natural gas.

OperatorGoogleas mapped
Roof area74 ac18 buildings
Grid CO₂920 lbper MWh, MROW region
Nearest plant2.2 miWalter Scott Jr Energy Ce…

Location

This data centerOther data centersPower plants (colored by fuel)

CountyPottawattamie County, Iowa
Coordinates41.17470, -95.79974
On OpenStreetMapway/1073720208, way/1073720209, way/1073720210, way/1073720211, way/1073720212, way/1073720213 and 12 more

What powers Google data center, Council Bluffs

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% wind, 35% coal, 13% natural gas and 8% nuclear.

Each megawatt-hour carried about 920 lb of CO₂, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

Utilities that serve Pottawattamie County

UtilityTypeGridBusiness rateIndustrial rate
MidAmerican Energy CoInvestor OwnedMISO (Midcontinent ISO)8.4¢6.0¢

Utilities that report serving Pottawattamie County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Walter Scott Jr Energy CenterCoal1,648 MW2.2 mi
Missouri River Wastewater TreatmentBiomass3.0 MW7.0 mi
Jones StreetOil130 MW8.3 mi
Sarpy CountyNatural Gas338 MW8.9 mi
North OmahaCoal645 MW13.1 mi
Cass CountyNatural Gas345 MW17.9 mi
Standing Bear LakeNatural Gas163 MW18.1 mi
Turtle CreekNatural Gas528 MW20.0 mi
Fort Calhoun Community SolarSolar5.0 MW22.2 mi
BRIGHT BatteryOther Fossil1.0 MW28.8 mi

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, Council BluffsOperator not recorded5.2 ac4.7 mi
OCB1CyrusOne2.7 ac4.8 mi

More

Data centers in Iowa · Data centers in Pottawattamie County · All Google data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me