Turtle Creek is a natural gas power plant in Nebraska with a nameplate capacity of 528 MW.
The 528 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 14601 South 168th Street |
|---|---|
| City | Springfield |
| County | Sarpy County |
| State | Nebraska |
| ZIP | 68059 |
| Coordinates | 41.09224, -96.16831 |
| Operator | Omaha Public Power District |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | Natural Gas | 264 MW | Operating | 2025 |
| 2 | Natural Gas Fired Combustion Turbine | Natural Gas | 264 MW | Operating | 2025 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Southwest Power Pool |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Meta Sarpy Data center | 2.4 mi |
| Travelers Insurance data center, Omaha | 2.7 mi |
| Google data center, Omaha | 3.2 mi |
| Fidelity data center, La Vista | 6.7 mi |
| Yahoo data center, La Vista | 7.5 mi |
| Verizon Wireless data center, 4002 South 149th Circle, Omaha | 8.9 mi |
| Scott Data Center | 13.1 mi |
| 1623 Farnam | 16.5 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map