Data Centers in Massachusetts

3 data centers mapped in Massachusetts: 3 buildings covering about 7 acres of roof. The most are in Middlesex County (2). Most sit in EPA's New England grid region, whose electricity is 56% natural gas, 23% nuclear and 8% hydroelectric, at 537 lb of CO₂ per megawatt-hour, 30% cleaner than the U.S. grid as a whole (765 lb).

Sites3mapped data centers
Buildings3mapped footprints
Roof area7.0 acbuilding footprints
Counties2with a data center

Map of data centers in Massachusetts

Data centerUnder construction

What powers Massachusetts's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Massachusetts's data centers sit in, and what those regions generate:

New England · 3 sites

537 lb CO₂ per MWh, 30% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 56%Nuclear 23%Hydroelectric 8%Biomass 4%Solar 4%Wind 3%

Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.

All power plants in Massachusetts →

By county

Operators

CoreSite (1) · Markley Group (1) · TierPoint (1)

Every mapped data center in Massachusetts

Data centerOperatorCity · CountyRoof area
CoreSite BO1CoreSiteSomerville · Middlesex3.1 ac
Markley Data CenterMarkley GroupLowell · Middlesex2.8 ac
TierPoint data center, 15 Shattuck Road, AndoverTierPointAndover · Essex1.2 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me