Data Centers in West Virginia

2 data centers mapped in West Virginia: 2 buildings covering about 1 acres of roof. Most sit in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites2mapped data centers
Buildings2mapped footprints
Roof area—building footprints
Counties2with a data center

Map of data centers in West Virginia

Data centerUnder construction

What powers West Virginia's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions West Virginia's data centers sit in, and what those regions generate:

Ohio Valley · 2 sites

911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

All power plants in West Virginia →

By county

Every mapped data center in West Virginia

Data centerOperatorCity · CountyRoof area
Alpha FederalAlpha InnovationsSouth Charleston · Kanawha—
Morgan WirelessOperator not recordedBath (Berkeley Springs) · Morgan—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me