Data Centers in Collin County, TX

14 data centers are mapped in Collin County, Texas: 15 buildings covering about 39.1 acres (1,705,000 sq ft) of roof. Operators include Aligned, CyrusOne, Flexential, Aligned Data Centers. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.

Sites14mapped data centers
Buildings15mapped footprints
Roof area39 acbuilding footprints
GridERCOTlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Collin County

Data centerOperatorCityRoof area
DFW3CyrusOneAllen7.8 ac
Evoque Allen DA1CentersquareAllen5.4 ac
Flexential Dallas - PlanoFlexentialPlano5.0 ac
Aligned Data Centers DFW-04Aligned Data CentersPlano4.9 ac
Cisco AllenOperator not recordedAllen3.7 ac
DFW4CyrusOneAllen2.7 ac
Aligned DFW-01AlignedPlano2.5 ac
Aligned DFW-02AlignedPlano2.0 ac
Experian McKinney Data CenterOperator not recordedFrisco1.8 ac
Flexential Dallas - RichardsonFlexentialRichardson1.6 ac
DA2TierPointAllen0.7 ac
US-South 01ScaleMatrixAllen0.7 ac
Stream DFW IVStreamRichardson0.4 ac
DataBank Plano Data CenterDataBankPlano—

What the grid here generates

Data centers in Collin County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Collin County

UtilityTypeGridBusiness rateIndustrial rate
Denton County Elec Coop, IncCooperativeERCOT14.2¢11.4¢
Farmers Electric Coop, Inc - (TX)CooperativeERCOT10.9¢6.2¢
Grayson-Collin Elec Coop, IncCooperativeERCOT14.8¢—
Fannin County Electric CoopCooperativeERCOT11.5¢31.7¢

Utilities that report serving Collin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Collin County

PlantFuelCapacity
Ray OlingerNatural Gas428 MW
Wigeon Whistle Battery Storage PlantBattery Storage120 MW
Farmersville (TX)Battery Storage9.9 MW
Farmersville WestBattery Storage9.9 MW
Toyota HQ PlanSolar7.7 MW
OTHERChildrensPlanoNatural Gas6.4 MW
Wal202Oil1.3 MW
Wal5211Oil1.3 MW
Wal5311Oil1.3 MW
Wal2883Natural Gas1.2 MW
Heb00790Natural Gas1.2 MW
Heb00796Natural Gas1.2 MW
Heb00794Natural Gas1.2 MW

All power plants in Collin County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me