Flexential Dallas - Plano is a data center in Plano, Collin County, Texas. It is mapped as 1 building covering about 5.0 acres (217,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 3500 East Plano Parkway, Plano TX 75074 |
|---|---|
| County | Collin County, Texas |
| Coordinates | 33.00694, -96.66629 |
| Website | www.flexential.com/data-centers/tx/dallas/plano-data-center |
| On OpenStreetMap | way/650412346 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.
Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Denton County Elec Coop, Inc | 14.2¢ | 11.4¢ |
| Farmers Electric Coop, Inc - (TX) | 10.9¢ | 6.2¢ |
| Grayson-Collin Elec Coop, Inc | 14.8¢ | — |
| Fannin County Electric Coop | 11.5¢ | 31.7¢ |
Utilities that report serving Collin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Heb00796 | Natural Gas | 1.2 MW | 7.6 mi |
| Heb00790 | Natural Gas | 1.2 MW | 8.3 mi |
| OTHERChildrensPlano | Natural Gas | 6.4 MW | 9.3 mi |
| Wal3406 | Natural Gas | 1.2 MW | 9.3 mi |
| Wal2883 | Natural Gas | 1.2 MW | 9.9 mi |
| Wal202 | Oil | 1.3 MW | 10.1 mi |
| Wal5211 | Oil | 1.3 MW | 10.4 mi |
| Toyota HQ Plan | Solar | 7.7 MW | 11.4 mi |
| Wal3224 | Natural Gas | 1.2 MW | 12.1 mi |
| Heb00794 | Natural Gas | 1.2 MW | 12.2 mi |
The largest power plant within 50 miles is Forney Energy Center, a 1,894 MW natural gas plant 20 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Aligned Data Centers DFW-04 | 4.9 ac | 0.5 mi |
| Stream DFW IV | 0.4 ac | 0.5 mi |
| Aligned DFW-02 | 2.0 ac | 0.5 mi |
| Aligned DFW-01 | 2.5 ac | 0.6 mi |
| Stream Data Centers DFWA | 6.4 ac | 1.7 mi |
| NTT data center, Richardson | 16 ac | 1.9 mi |
| Digital Realty data center, Garland | 10 ac | 2.4 mi |
| Digital Realty Dallas DFW29 | 4.2 ac | 3.8 mi |
| Digital Realty Dallas DFW35 | 2.7 ac | 3.8 mi |
| Digital Realty Dallas DFW28 | 2.8 ac | 3.8 mi |
| Digital Realty Dallas DFW17 | 1.9 ac | 3.9 mi |
| Digital Realty Dallas DFW18 | 5.1 ac | 3.9 mi |
| Digital Realty Dallas DFW16 | 2.5 ac | 4.0 mi |
| Rackspace Richardson DFW3 | 2.6 ac | 4.1 mi |
Data centers in Texas · Data centers in Collin County · All Flexential data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.