Data Centers in Fairfax County, VA

30 data centers are mapped in Fairfax County, Virginia: 33 buildings covering about 62.5 acres (2,722,000 sq ft) of roof. Operators include Amazon Web Services, CoreSite, Digital Realty, Equinix. The county is in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour.

Sites30mapped data centers
Buildings33mapped footprints
Roof area62 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Fairfax County

Data centerOperatorCityRoof area
Amazon IAD-500Amazon Web ServicesHerndon6.4 ac
CoreSite VA3CoreSiteReston5.7 ac
Menlo Digital MD-VA1Operator not recordedHerndon3.5 ac
Amazon IAD-501Amazon Web ServicesHerndon3.4 ac
CoreSite VA1CoreSiteReston3.2 ac
Amazon IAD-165Amazon Web ServicesHerndon3.1 ac
Amazon IAD-167Amazon Web ServicesHerndon3.0 ac
Amazon IAD-166Amazon Web ServicesHerndon3.0 ac
Amazon DCA-64Amazon Web ServicesSpringfield2.8 ac
Amazon IAD-134Amazon Web ServicesChantilly2.8 ac
Amazon IAD-135Amazon Web ServicesChantilly2.7 ac
Amazon IAD-168Amazon Web ServicesHerndon2.6 ac
Amazon IAD-1Amazon Web ServicesChantilly2.1 ac
Amazon IAD-9Amazon Web ServicesChantilly2.0 ac
Equinix DC7EquinixVienna1.8 ac
Digital Realty VA3Digital RealtyReston1.7 ac
Digital Realty IAD30Digital RealtyChantilly1.7 ac
Data center, AlexandriaOperator not recordedAlexandria1.4 ac
Data center, NewingtonOperator not recordedNewington1.3 ac
Data center, 4120 Lafayette Center Drive, ChantillyOperator not recordedChantilly1.2 ac
H5 IAD32IBMChantilly1.2 ac
Equinix DC97EquinixHerndon1.0 ac
H5 IAD31IBMChantilly1.0 ac
Lumen McLean 1Lumen TechnologiesMcLean1.0 ac
CoreSite VA2CoreSiteReston0.9 ac
Amazon IAD-22Amazon Web ServicesChantilly0.7 ac
DataBank IAD2DataBankMcLean0.5 ac
8100 Boone BoulevardDigital RealtyDunn Loring0.4 ac
Evocative IAD1EvocativeReston0.4 ac
Lumen McLeanLumen TechnologiesMcLean—

What the grid here generates

Data centers in Fairfax County draw from the regional grid. In 2023, electricity in EPA's Virginia/Carolinas region was 40% nuclear, 39% natural gas, 10% coal and 6% solar, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Fairfax County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Fairfax County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Fairfax County

PlantFuelCapacity
Covanta Fairfax EnergyBiomass124 MW
Fairfax LandfillSolar5.0 MW
I 95 Landfill Phase IIBiomass3.2 MW
Reston Town Center Solar 1Solar1.0 MW

All power plants in Fairfax County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me