Data center, Alexandria

Data center, Alexandria is a data center in Alexandria, Fairfax County, Virginia. It is mapped as 2 buildings covering about 1.4 acres (59,000 sq ft). Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorOperator not recordedas mapped
Roof area1.4 ac2 buildings
Grid CO₂594 lbper MWh, RFCE region
Nearest plant4.8 miCovanta Alexandria/Arling…

Location

This data centerOther data centersPower plants (colored by fuel)

CountyFairfax County, Virginia
Coordinates38.73503, -77.15294
On OpenStreetMapway/1561752472, way/1561752473

What powers Data center, Alexandria

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Fairfax County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Fairfax County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Covanta Alexandria/Arlington EnergyBiomass29.0 MW4.8 mi
Covanta Fairfax EnergyBiomass124 MW5.5 mi
I 95 Landfill Phase IIBiomass3.2 MW5.5 mi
Fairfax LandfillSolar5.0 MW5.7 mi
DC Water SolarSolar3.5 MW9.3 mi
Walt Bailey Bioenergy FacilityBiomass14.1 MW9.3 mi
Livingston Crossing (CSG)Solar2.0 MW9.8 mi
Synergen Panorama, LLC CSGSolar5.0 MW10.0 mi
Oxon Run CREFSolar2.0 MW10.0 mi
WW-DC Solar 1, LLCSolar1.2 MW10.3 mi

The largest power plant within 50 miles is Calvert Cliffs Nuclear Power Plant, a 1,850 MW nuclear plant 44 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Amazon DCA-64Amazon Web Services2.8 ac1.9 mi
Data center, NewingtonOperator not recorded1.3 ac2.6 mi

More

Data centers in Virginia · Data centers in Fairfax County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me