Fairfax County, Virginia has 4 power plants totaling 133 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Covanta Fairfax Energy | Lorton | Biomass | 124 MW | Covanta Fairfax Inc |
| Fairfax Landfill | Lorton | Solar | 5.0 MW | Madison Energy Investments LLC |
| I 95 Landfill Phase II | Lorton | Biomass | 3.2 MW | NextEra Renewable Fuels, LLC |
| Reston Town Center Solar 1 | Reston | Solar | 1.0 MW | Reston Town Center Solar 1 LLC |
Fairfax County, Virginia has 4 power plants totaling 133 MW of nameplate capacity. Biomass is the dominant fuel source at 95% of installed capacity, followed by Solar (5%). The largest facility is Covanta Fairfax Energy at 124 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Fairfax County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.