13 data centers mapped in New Mexico: 17 buildings covering about 75 acres of roof. The most are in Bernalillo County (9). Most sit in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions New Mexico's data centers sit in, and what those regions generate:
703 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
CenturyLink (1) · Meta (1) · Molina Healthcare (1) · Oso Grande (1) · SONM (1) · Sandia National Laboratories (1) · UNM (1) · UNMH (1) · WSMR (1) · bigbyte.cc (1)
| Data center | City · County | Roof area |
|---|---|---|
| Meta data center, Los Lunas | Los Lunas · Valencia | 72 ac |
| 725 | Albuquerque · Bernalillo | 1.0 ac |
| Information Systems Facility | White Sands · Doña Ana | 0.8 ac |
| CenturyLink data center, Las Cruces | Las Cruces · Doña Ana | 0.7 ac |
| John F. Simms Building | Santa Fe · Santa Fe | 0.7 ac |
| Molina Healthcare data center, Albuquerque | Albuquerque · Bernalillo | 0.6 ac |
| Southwest Cyberport | Albuquerque · Bernalillo | — |
| Oso Grande data center, Albuquerque | Albuquerque · Bernalillo | — |
| 505 Marquette | Albuquerque · Bernalillo | — |
| 123 Central | Albuquerque · Bernalillo | — |
| UNM Data Center | Albuquerque · Bernalillo | — |
| HPC | Albuquerque · Bernalillo | — |
| UNMH data center, Albuquerque | Albuquerque · Bernalillo | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.