9 data centers are mapped in Bernalillo County, New Mexico: 9 buildings covering about 1.6 acres (68,000 sq ft) of roof. Operators include Molina Healthcare, Oso Grande, Sandia National Laboratories, UNM. The county is in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| 725 | Albuquerque | 1.0 ac |
| Molina Healthcare data center, Albuquerque | Albuquerque | 0.6 ac |
| Southwest Cyberport | Albuquerque | — |
| Oso Grande data center, Albuquerque | Albuquerque | — |
| 505 Marquette | Albuquerque | — |
| 123 Central | Albuquerque | — |
| UNM Data Center | Albuquerque | — |
| HPC | Albuquerque | — |
| UNMH data center, Albuquerque | Albuquerque | — |
Data centers in Bernalillo County draw from the regional grid. In 2023, electricity in EPA's Southwest (Arizona/New Mexico) region was 49% natural gas, 18% nuclear, 11% coal and 8% solar, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Co of NM | 12.2¢ | 5.6¢ |
| Continental Divide El Coop Inc | 13.3¢ | 6.6¢ |
| Central New Mexico El Coop, Inc | 22.5¢ | 7.9¢ |
Utilities that report serving Bernalillo County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Atrisco Energy Storage | Battery Storage | 300 MW |
| Atrisco Solar LLC | Solar | 300 MW |
| Quail Ranch Solar and BESS | Battery Storage | 200 MW |
| Reeves | Natural Gas | 154 MW |
| Rio Bravo | Natural Gas | 150 MW |
| Sandia Energy Center | Battery Storage | 60.0 MW |
| Ford Utilities Center | Natural Gas | 14.8 MW |
| Santolina Solar Energy Center | Solar | 10.5 MW |
| South Valley Solar Energy Center | Solar | 10.0 MW |
| Facebook 2 Solar Energy Center | Solar | 10.0 MW |
| Facebook 3 Solar Energy Center | Solar | 10.0 MW |
| Rio Rancho Solar Energy Center | Solar | 10.0 MW |
| Southside Water Reclamation Plant | Biomass | 6.6 MW |
| Netflix ABQ System A | Solar | 2.6 MW |
| Albuquerque Solar Energy Center | Solar | 2.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.