Electric generating plantEIA plant no. 67003

Atrisco Solar LLC

Type
Solar Photovoltaic
Nameplate capacity
300 MW
Units
1
In service since
2024
Operator
Atrisco Solar LLC
Location
Rio Rancho, Bernalillo County, New Mexico
Rated 13th largest in New Mexico · 1069th of 14,761 in the U.S. · by nameplate

Atrisco Solar LLC is a solar power plant in New Mexico with a nameplate capacity of 300 MW.

The 300 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

AddressTbd
CityRio Rancho
CountyBernalillo County
StateNew Mexico
ZIP87121
Coordinates35.18906, -106.86050
OperatorAtrisco Solar LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ATRPVSolar PhotovoltaicSolar300 MWOperating2024

Ownership

OwnerLocationShare
Clenera LLCBoise, ID10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of New Mexico

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Bernalillo County

View all plants in Bernalillo County →