Data center, Cumming is a data center in Cumming, Polk County, Iowa. It is mapped as 4 buildings covering about 23.7 acres (1,033,000 sq ft). Its power comes off the Upper Midwest grid (MISO (Midcontinent ISO)), which runs on 38% wind, 35% coal and 13% natural gas.

OperatorOperator not recordedas mapped
Roof area24 ac4 buildings
Grid CO₂920 lbper MWh, MROW region
Nearest plant7.4 miRiver Hills

Location

This data centerOther data centersPower plants (colored by fuel)

CountyPolk County, Iowa
Coordinates41.51553, -93.72101
On OpenStreetMapway/1368776076, way/1368776077, way/1454813845, way/1454813846

What powers Data center, Cumming

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% wind, 35% coal, 13% natural gas and 8% nuclear.

Each megawatt-hour carried about 920 lb of CO₂, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

Utilities that serve Polk County

UtilityTypeGridBusiness rateIndustrial rate
MidAmerican Energy CoInvestor OwnedMISO (Midcontinent ISO)8.4¢6.0¢
Interstate Power and Light CoInvestor OwnedMISO (Midcontinent ISO)13.4¢8.2¢
Midland Power CoopCooperativeMISO (Midcontinent ISO)11.3¢7.0¢
Consumers Energy Coop - (IA)CooperativeMISO (Midcontinent ISO)11.8¢6.5¢

Utilities that report serving Polk County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
River HillsNatural Gas128 MW7.4 mi
Des Moines Wastewater Reclamation FacBiomass2.8 MW9.3 mi
Anderson EricksonOil2.0 MW9.5 mi
Archer Daniels Midland Des MoinesCoal7.9 MW10.3 mi
Greater Des MoinesNatural Gas576 MW10.4 mi
Pleasant HillNatural Gas180 MW10.6 mi
Sycamore (IA)Natural Gas158 MW11.1 mi
IndianolaOil40.9 MW13.5 mi
Indianola SolarSolar3.4 MW14.2 mi
WintersetOil17.6 MW19.5 mi

The largest power plant within 50 miles is Greater Des Moines, a 576 MW natural gas plant 10 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Microsoft data center, Des MoinesMicrosoft27 ac0.9 mi
Microsoft data center, CummingMicrosoft28 ac3.7 mi

More

Data centers in Iowa · Data centers in Polk County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me