Meta Gallatin Data Center is a data center in Castalian Springs, Sumner County, Tennessee. It is mapped as 3 buildings covering about 42.9 acres (1,870,000 sq ft). Its power comes off the Tennessee Valley grid (Tennessee Valley Authority), which runs on 33% nuclear, 30% natural gas and 28% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Sumner County, Tennessee |
|---|---|
| Coordinates | 36.40985, -86.36751 |
| On OpenStreetMap | way/1294595615, way/1312795639, way/1312795640 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Tennessee Valley grid region, and the county's largest utility is on the Tennessee Valley Authority grid. In 2023, the region's electricity was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric.
Each megawatt-hour carried about 895 lb of CO₂, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Nashville Electric Service | 12.0¢ | 7.6¢ |
| Cumberland Elec Member Corp | 12.9¢ | 6.8¢ |
| Tri-County Elec Member Corp (TN) | 12.9¢ | 7.1¢ |
| City of Gallatin - (TN) | 10.6¢ | 5.7¢ |
Utilities that report serving Sumner County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Gallatin (TN) | Coal | 1,918 MW | 6.8 mi |
| Old Hickory | Hydroelectric | 104 MW | 17.8 mi |
| J P Priest | Hydroelectric | 28.0 MW | 22.4 mi |
| Opryland USA | Natural Gas | 4.5 MW | 22.8 mi |
| SR Warren, LLC | Solar | 3.5 MW | 23.1 mi |
| SR Franklin, LLC | Solar | 2.5 MW | 23.2 mi |
| Music City Community Solar | Solar | 1.6 MW | 23.9 mi |
| Cordell Hull | Hydroelectric | 99.9 MW | 25.0 mi |
| Vanderbilt University Power Plant | Natural Gas | 18.7 MW | 30.4 mi |
| Center Hill | Hydroelectric | 156 MW | 37.0 mi |
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Gallatin Data Center | — | 0.3 mi |
Data centers in Tennessee · Data centers in Sumner County · All Meta data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.