RIC3 DC3 under construction

RIC3 DC3 is a data center under construction run by Quality Technology Services in Sandston, Henrico County, Virginia. It is mapped as 1 building covering about 5.2 acres (228,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorQuality Technology Servicesas mapped
Roof area5.2 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant3.2 miBriel Solar Farm

Location

This data centerOther data centersPower plants (colored by fuel)

Address3535 Portugee Road, Sandston VA 23150
CountyHenrico County, Virginia
Coordinates37.47869, -77.25324
On OpenStreetMapway/1493516631

What powers RIC3 DC3

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Henrico County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢

Utilities that report serving Henrico County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Briel Solar FarmSolar20.0 MW3.2 mi
Skipjack Solar CenterSolar175 MW5.9 mi
Keydet Solar CenterSolar120 MW5.9 mi
DarbytownNatural Gas368 MW6.5 mi
Richmond EnergyBiomass6.4 MW6.9 mi
Charles CityBiomass14.4 MW7.4 mi
Philip MorrisSolar2.0 MW9.6 mi
ChesterfieldNatural Gas447 MW9.8 mi
Park 500 Philip Morris USANatural Gas13.0 MW9.8 mi
Spruance Operating Services LLCNatural Gas115 MW9.9 mi

The largest power plant within 50 miles is North Anna, a 1,960 MW nuclear plant 50 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
RIC3 DC2 under constructionQuality Technology Services5.2 ac0.1 mi
RIC3 DC1 under constructionQuality Technology Services5.2 ac0.2 mi
RIC3 DC5 under constructionQuality Technology Services5.2 ac0.2 mi
RIC3 DC4 under constructionQuality Technology Services5.2 ac0.2 mi
DC4Quality Technology Services3.9 ac0.5 mi
DC5Quality Technology Services3.7 ac0.5 mi
DC6Quality Technology Services3.9 ac0.5 mi
RIC2 DC6 under constructionOperator not recorded5.8 ac0.6 mi
RIC2 DC5Operator not recorded5.8 ac0.7 mi
RIC1 DC3Quality Technology Services—0.8 mi
RIC1 DC2Quality Technology Services—0.8 mi
RIC1 DC1Quality Technology Services—0.8 mi
RIC2 DC3Operator not recorded5.8 ac0.8 mi
RIC2 DC2Operator not recorded5.8 ac0.9 mi
RIC2 DC1Operator not recorded5.8 ac1.0 mi

And 2 more within 5 miles.

More

Data centers in Virginia · Data centers in Henrico County · All Quality Technology Services data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me