Keydet Solar Center is a solar power plant in Virginia with a nameplate capacity of 120 MW.
The 120 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 8411 Roxbury Road |
|---|---|
| City | Charles City |
| County | Charles City County |
| State | Virginia |
| ZIP | 23030 |
| Coordinates | 37.43710, -77.15870 |
| Operator | AES Clean Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| KEYDT | Solar Photovoltaic | Solar | 120 MW | Under Construction | — |
| NERC Region | SERC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Meta Henrico Data Center | 5.0 mi |
| RIC2 DC5 | 5.7 mi |
| RIC2 DC6 under construction | 5.7 mi |
| RIC2 DC1 | 5.7 mi |
| RIC2 DC2 | 5.7 mi |
| RIC2 DC3 | 5.7 mi |
| RIC3 DC5 under construction | 5.7 mi |
| RIC3 DC4 under construction | 5.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map