RIC2 DC3 is a data center in Sandston, Henrico County, Virginia. It is mapped as 1 building covering about 5.8 acres (252,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 6050 Technology Boulevard, Sandston VA 23150 |
|---|---|
| County | Henrico County, Virginia |
| Coordinates | 37.48626, -77.24206 |
| On OpenStreetMap | way/1493516625 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.
Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Virginia Electric & Power Co | 8.9¢ | 7.9¢ |
Utilities that report serving Henrico County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Briel Solar Farm | Solar | 20.0 MW | 2.8 mi |
| Skipjack Solar Center | Solar | 175 MW | 5.7 mi |
| Keydet Solar Center | Solar | 120 MW | 5.7 mi |
| Darbytown | Natural Gas | 368 MW | 7.0 mi |
| Charles City | Biomass | 14.4 MW | 7.0 mi |
| Richmond Energy | Biomass | 6.4 MW | 7.3 mi |
| VA - Ameresco - Mechanicsville | Solar | 5.0 MW | 10.2 mi |
| Philip Morris | Solar | 2.0 MW | 10.3 mi |
| Park 500 Philip Morris USA | Natural Gas | 13.0 MW | 10.4 mi |
| Spruance Operating Services LLC | Natural Gas | 115 MW | 10.6 mi |
The largest power plant within 50 miles is North Anna, a 1,960 MW nuclear plant 50 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| RIC2 DC2 | 5.8 ac | 0.1 mi |
| RIC2 DC5 | 5.8 ac | 0.1 mi |
| RIC2 DC1 | 5.8 ac | 0.2 mi |
| RIC2 DC6 under construction | 5.8 ac | 0.2 mi |
| RIC1 DC3 | — | 0.2 mi |
| RIC1 DC2 | — | 0.3 mi |
| DC4 | 3.9 ac | 0.3 mi |
| RIC1 DC1 | — | 0.4 mi |
| DC5 | 3.7 ac | 0.4 mi |
| DC6 | 3.9 ac | 0.4 mi |
| Bank of America data center, 6050 White Oak Creek Drive, Sandston | 4.5 ac | 0.6 mi |
| Meta Henrico Data Center | 35 ac | 0.7 mi |
| RIC3 DC1 under construction | 5.2 ac | 0.7 mi |
| RIC3 DC4 under construction | 5.2 ac | 0.7 mi |
| RIC3 DC2 under construction | 5.2 ac | 0.7 mi |
And 2 more within 5 miles.
Data centers in Virginia · Data centers in Henrico County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.