2 data centers mapped in Arkansas: 2 buildings covering about 1 acres of roof. Most sit in EPA's Mississippi Valley grid region, whose electricity is 65% natural gas, 22% nuclear and 8% coal, at 739 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Arkansas's data centers sit in, and what those regions generate:
739 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mississippi Valley grid region (SRMV) in 2023, from eGRID. 176 TWh from 161 plants.
City of Searcy (1) · TierPoint (1)
| Data center | City · County | Roof area |
|---|---|---|
| TierPoint Little Rock | Little Rock · Pulaski | 0.7 ac |
| Searcy Information Technologies | Searcy · White | 0.1 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.