Data Centers in Arkansas

2 data centers mapped in Arkansas: 2 buildings covering about 1 acres of roof. Most sit in EPA's Mississippi Valley grid region, whose electricity is 65% natural gas, 22% nuclear and 8% coal, at 739 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites2mapped data centers
Buildings2mapped footprints
Roof area0.8 acbuilding footprints
Counties2with a data center

Map of data centers in Arkansas

Data centerUnder construction

What powers Arkansas's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Arkansas's data centers sit in, and what those regions generate:

Mississippi Valley · 2 sites

739 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).

Natural Gas 65%Nuclear 22%Coal 8%

Share of electricity generated in EPA's Mississippi Valley grid region (SRMV) in 2023, from eGRID. 176 TWh from 161 plants.

All power plants in Arkansas →

By county

Operators

City of Searcy (1) · TierPoint (1)

Every mapped data center in Arkansas

Data centerOperatorCity · CountyRoof area
TierPoint Little RockTierPointLittle Rock · Pulaski0.7 ac
Searcy Information TechnologiesCity of SearcySearcy · White0.1 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me