Searcy Information Technologies is a data center run by City of Searcy in Searcy, White County, Arkansas. It is mapped as 1 building covering about 4,600 sq ft. Its power comes off the Mississippi Valley grid (MISO (Midcontinent ISO)), which runs on 65% natural gas, 22% nuclear and 8% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 101 North Elm Street, Searcy AR 72143 |
|---|---|
| County | White County, Arkansas |
| Coordinates | 35.24924, -91.74095 |
| On OpenStreetMap | way/1020721870 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mississippi Valley grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 65% natural gas, 22% nuclear and 8% coal.
Each megawatt-hour carried about 739 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mississippi Valley grid region (SRMV) in 2023, from eGRID. 176 TWh from 161 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Entergy Arkansas LLC | 10.2¢ | 6.4¢ |
| First Electric Coop Corp | 16.2¢ | 7.6¢ |
Utilities that report serving White County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Searcy Water I | Solar | 1.0 MW | 1.8 mi |
| Searcy Water II | Solar | 2.8 MW | 3.0 mi |
| Searcy Solar Hybrid | Solar | 110 MW | 3.1 mi |
| Happy Solar 1 | Solar | 95.0 MW | 7.2 mi |
| Woodruff County Solar | Solar | 122 MW | 22.6 mi |
| Greers Ferry Lake | Hydroelectric | 96.0 MW | 23.6 mi |
| White River Lock and Dam 2 | Hydroelectric | 3.5 MW | 34.2 mi |
| Independence Steam Electric Station | Coal | 1,800 MW | 35.1 mi |
| White River Lock and Dam 1 | Hydroelectric | 4.3 MW | 35.6 mi |
| White River Medical Center | Solar | 2.9 MW | 36.9 mi |
The largest power plant within 50 miles is Independence Steam Electric Station, a 1,800 MW coal plant 35 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.