Electric generating plantEIA plant no. 63766

Happy Solar 1

Type
Solar Photovoltaic
Nameplate capacity
95.0 MW
Units
1
In service since
2023
Operator
Lightsource Renewable Energy Asset Management, LLC
Location
Searcy, White County, Arkansas
Rated 44th largest in Arkansas · 2940th of 14,761 in the U.S. · by nameplate

Happy Solar 1 is a solar power plant in Arkansas with a nameplate capacity of 95.0 MW. It generates roughly 34.9k MWh per year — enough to power about 3,319 average U.S. homes.

Its capacity factor of 4% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Happy Solar 1 could make 832.2k MWh. In 2023 it made 34.9k MWh — the same as running at full power 4 hours in every 100.

Nameplate, full year832.2k MWh95.0 MW × 8,760 hours
Actually generated34.9k MWhEPA eGRID, 2023 · ≈3,319 homes

Peaking or variableCapacity factor 4%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Location

Address441 Joe Pantel Road
CitySearcy
CountyWhite County
StateArkansas
ZIP72143
Coordinates35.16772, -91.66028
OperatorLightsource Renewable Energy Asset Management, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ARHA1Solar PhotovoltaicSolar95.0 MWOperating2023

Ownership

OwnerLocationShare
Happy Solar 1, LLCSan Francisco, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in White County

View all plants in White County →

Data centers near Happy Solar 1

Data centerOperatorDistance
Searcy Information TechnologiesCity of Searcy7.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more