Bent County, Colorado has 2 power plants totaling 81 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Twin Buttes Wind Project | Lamar | Wind | 75.0 MW | Avangrid Power Llc |
| Las Animas | Las Animas | Oil | 5.6 MW | City Of Las Animas - (Co) |
Bent County, Colorado has 2 power plants totaling 81 MW of nameplate capacity. Wind is the dominant fuel source at 93% of installed capacity, followed by Oil (7%). The largest facility is Twin Buttes Wind Project at 75 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Bent County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.