Larimer County, Colorado has 12 power plants totaling 1,053 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Rawhide | Wellington | Coal | 800 MW | Platte River Power Authority |
| Flatiron | Loveland | Hydroelectric | 94.5 MW | U S Bureau Of Reclamation |
| Estes | Estes Park | Hydroelectric | 45.0 MW | U S Bureau Of Reclamation |
| Pole Hill | Loveland | Hydroelectric | 38.2 MW | U S Bureau Of Reclamation |
| Bison Solar Llc | Wellington | Solar | 30.0 MW | Bison Solar Llc |
| Rawhide Prairie Solar Hybrid | Wellington | Solar | 23.0 MW | Greenbacker Renewable Energy Corporation |
| Marys Lake | Estes Park | Hydroelectric | 8.1 MW | U S Bureau Of Reclamation |
| Big Thompson | Loveland | Hydroelectric | 4.5 MW | U S Bureau Of Reclamation |
| Rv Csu Power Ii Llc | Fort Collins | Solar | 3.0 MW | Rv Csu Power Ii Llc |
| Carter Hydro | Berthoud | Hydroelectric | 2.6 MW | Northern Colorado Water Conservancy District |
| Rv Csu Power Llc | Fort Collins | Solar | 1.9 MW | Rv Csu Power Llc |
| Coyote Ridge Community Solar | Fort Collins | Solar | 1.5 MW | Poudre Valley Rea, Inc |
Larimer County, Colorado has 12 power plants totaling 1,053 MW of nameplate capacity. Coal is the dominant fuel source at 76% of installed capacity, followed by Hydroelectric (18%) and Solar (6%). The largest facility is Rawhide at 800 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Larimer County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.