Otero County, Colorado has 2 power plants totaling 12 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Rocky Ford | Rocky Ford | Oil | 10.0 MW | Black Hills Colorado Electric, Llc |
| Bh Csg 3 | La Junta | Solar | 1.5 MW | Pivot Energy |
Otero County, Colorado has 2 power plants totaling 12 MW of nameplate capacity. Oil is the dominant fuel source at 87% of installed capacity, followed by Solar (13%). The largest facility is Rocky Ford at 10 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Otero County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.