Saguache County, Colorado has 1 power plant totaling 3 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| San Luis Valley Solar Array | Center | Solar | 2.7 MW | Aep Onsite Partners, Llc |
Saguache County, Colorado has 1 power plant totaling 3 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity. The largest facility is San Luis Valley Solar Array at 2 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Saguache County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.