Cable & Wireless Cable Landing Station is a data center in Shirley, Suffolk County, New York. It is mapped as 1 building covering about 36,500 sq ft. Its power comes off the Long Island grid (New York ISO), which runs on 87% natural gas, 5% other and 4% biomass.
This data centerOther data centersPower plants (colored by fuel)
| Address | 21 Ramsey Road, Shirley NY 11967 |
|---|---|
| County | Suffolk County, New York |
| Coordinates | 40.84365, -72.88337 |
| On OpenStreetMap | way/459188725 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Long Island grid region, and the county's largest utility is on the New York ISO grid. In 2023, the region's electricity was 87% natural gas, 5% other and 4% biomass.
Each megawatt-hour carried about 1,180 lb of CO₂, 54% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Long Island grid region (NYLI) in 2023, from eGRID. 9.8 TWh from 67 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Long Island Power Authority | 21.5¢ | — |
| Fishers Island Utility Co Inc | 22.2¢ | — |
Utilities that report serving Suffolk County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Calabro Airport North Solar Project | Solar | 1.3 MW | 1.5 mi |
| Long Island Solar Farm LLC | Solar | 31.5 MW | 2.2 mi |
| Calabro Airport South Solar Project | Solar | 1.2 MW | 2.6 mi |
| Caithness Long Island Energy Center | Natural Gas | 349 MW | 3.6 mi |
| Brookhaven Landfill Solar Farm 1 | Solar | 5.0 MW | 3.7 mi |
| SWM Fuel Cell | Natural Gas | 8.4 MW | 4.4 mi |
| Orbit Bloom Fuel Cell | Natural Gas | 6.0 MW | 4.6 mi |
| William Floyd School District | Natural Gas | 3.9 MW | 4.9 mi |
| Shoreham Solar Commons | Solar | 24.9 MW | 6.3 mi |
| Wading River | Oil | 239 MW | 7.8 mi |
The largest power plant within 50 miles is Millstone, a 2,260 MW nuclear plant 49 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.