Data center, 20 Alexander Drive, Wallingford

Data center, 20 Alexander Drive, Wallingford is a data center in Wallingford, New Haven County, Connecticut. It is mapped as 1 building covering about 1.2 acres (54,000 sq ft). Its power comes off the New England grid (ISO New England), which runs on 56% natural gas, 23% nuclear and 8% hydroelectric.

OperatorOperator not recordedas mapped
Roof area1.2 ac1 building
Grid CO₂537 lbper MWh, NEWE region
Nearest plant2.7 miWallingford Energy

Location

This data centerOther data centersPower plants (colored by fuel)

Address20 Alexander Drive, Wallingford CT 06492
CountyNew Haven County, Connecticut
Coordinates41.47874, -72.80103
On OpenStreetMapway/959969621

What powers Data center, 20 Alexander Drive, Wallingford

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's New England grid region, and the county's largest utility is on the ISO New England grid. In 2023, the region's electricity was 56% natural gas, 23% nuclear, 8% hydroelectric and 4% biomass.

Each megawatt-hour carried about 537 lb of CO₂, 30% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 56%Nuclear 23%Hydroelectric 8%Biomass 4%Solar 4%Wind 3%

Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.

Utilities that serve New Haven County

UtilityTypeGridBusiness rateIndustrial rate
Connecticut Light & Power CoInvestor OwnedISO New England22.7¢21.4¢
United Illuminating CoInvestor OwnedISO New England24.3¢17.6¢
Town of Wallingford - (CT)MunicipalISO New England12.8¢11.0¢

Utilities that report serving New Haven County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Wallingford EnergyNatural Gas350 MW2.7 mi
A L PierceNatural Gas84.0 MW2.7 mi
Wallingford SolarSolar16.1 MW3.2 mi
Amazon BDL3 Solar ProjectSolar1.0 MW3.2 mi
CTGB Manson YouthSolar2.0 MW5.7 mi
CTGB Maloney and WebsterSolar2.0 MW5.7 mi
CP Middletown Solar I LLCSolar1.0 MW6.9 mi
CP Middletown Solar II LLCSolar1.0 MW6.9 mi
North Haven Solar OneSolar1.6 MW7.3 mi
FedEx MiddletownSolar1.5 MW9.2 mi

The largest power plant within 50 miles is Millstone, a 2,260 MW nuclear plant 35 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Connecticut · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me