Data center, 20 Alexander Drive, Wallingford is a data center in Wallingford, New Haven County, Connecticut. It is mapped as 1 building covering about 1.2 acres (54,000 sq ft). Its power comes off the New England grid (ISO New England), which runs on 56% natural gas, 23% nuclear and 8% hydroelectric.
This data centerOther data centersPower plants (colored by fuel)
| Address | 20 Alexander Drive, Wallingford CT 06492 |
|---|---|
| County | New Haven County, Connecticut |
| Coordinates | 41.47874, -72.80103 |
| On OpenStreetMap | way/959969621 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's New England grid region, and the county's largest utility is on the ISO New England grid. In 2023, the region's electricity was 56% natural gas, 23% nuclear, 8% hydroelectric and 4% biomass.
Each megawatt-hour carried about 537 lb of CO₂, 30% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's New England grid region (NEWE) in 2023, from eGRID. 103 TWh from 1,274 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Connecticut Light & Power Co | 22.7¢ | 21.4¢ |
| United Illuminating Co | 24.3¢ | 17.6¢ |
| Town of Wallingford - (CT) | 12.8¢ | 11.0¢ |
Utilities that report serving New Haven County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Wallingford Energy | Natural Gas | 350 MW | 2.7 mi |
| A L Pierce | Natural Gas | 84.0 MW | 2.7 mi |
| Wallingford Solar | Solar | 16.1 MW | 3.2 mi |
| Amazon BDL3 Solar Project | Solar | 1.0 MW | 3.2 mi |
| CTGB Manson Youth | Solar | 2.0 MW | 5.7 mi |
| CTGB Maloney and Webster | Solar | 2.0 MW | 5.7 mi |
| CP Middletown Solar I LLC | Solar | 1.0 MW | 6.9 mi |
| CP Middletown Solar II LLC | Solar | 1.0 MW | 6.9 mi |
| North Haven Solar One | Solar | 1.6 MW | 7.3 mi |
| FedEx Middletown | Solar | 1.5 MW | 9.2 mi |
The largest power plant within 50 miles is Millstone, a 2,260 MW nuclear plant 35 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.