Data center, 2236 Airport Drive, Wichita Falls is a data center in Wichita Falls, Wichita County, Texas. It is mapped as 1 building covering about 39,000 sq ft. Its power comes off the Texas (ERCOT) grid, which runs on 50% natural gas, 23% wind and 13% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 2236 Airport Drive, Wichita Falls TX 76306 |
|---|---|
| County | Wichita County, Texas |
| Coordinates | 33.95347, -98.52492 |
| On OpenStreetMap | way/747985149 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.
Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Works 4 | Oil | 4.9 MW | 3.8 mi |
| Wal414 | Natural Gas | 1.2 MW | 6.8 mi |
| Signal Hill Generating LLC | Natural Gas | 80.0 MW | 7.3 mi |
| Windthorst-2 | Wind | 67.6 MW | 31.7 mi |
| Western Trail Wind, LLC | Wind | 367 MW | 31.8 mi |
| Bobcat Bluff Wind Project LLC | Wind | 161 MW | 32.0 mi |
| 1370 Shannon | Wind | 204 MW | 32.1 mi |
| Diversion Wind Energy LLC | Wind | 201 MW | 32.9 mi |
| Electra Wind Farm | Wind | 230 MW | 35.5 mi |
| Trinity Hills | Wind | 198 MW | 40.8 mi |
The largest power plant within 50 miles is Western Trail Wind, LLC, a 367 MW wind plant 32 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.