Data center, Dowagiac

Data center, Dowagiac is a data center in Dowagiac, Cass County, Michigan. It is mapped as 1 building covering about 13.6 acres (594,000 sq ft). Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorOperator not recordedas mapped
Roof area14 ac1 building
Grid CO₂911 lbper MWh, RFCW region
Nearest plant11.0 miIndeck Niles Energy Center

Location

This data centerOther data centersPower plants (colored by fuel)

CountyCass County, Michigan
Coordinates41.99320, -86.09877
On OpenStreetMapway/1545590995

What powers Data center, Dowagiac

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Cass County

UtilityTypeGridBusiness rateIndustrial rate
Indiana Michigan Power CoInvestor OwnedPJM Interconnection12.2¢11.6¢
Midwest Energy Cooperative - (MI)CooperativePJM Interconnection17.7¢—

Utilities that report serving Cass County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Indeck Niles Energy CenterNatural Gas1,174 MW11.0 mi
Berrien SpringsHydroelectric7.2 MW12.3 mi
French Paper HydroHydroelectric1.3 MW14.5 mi
Watervliet PVSolar4.6 MW15.2 mi
WatervlietBiomass4.0 MW15.7 mi
Buchanan (MI)Hydroelectric4.4 MW16.8 mi
Southeast Berrien Generating FacilityBiomass4.8 MW17.2 mi
St. Joseph SolarSolar20.0 MW18.1 mi
University of Notre DameNatural Gas39.6 MW20.9 mi
Twin Branch PVSolar2.6 MW21.0 mi

The largest power plant within 50 miles is Donald C Cook, a 2,285 MW nuclear plant 24 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Michigan · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me