Data center, Sturtevant

Data center, Sturtevant is a data center in Sturtevant, Racine County, Wisconsin. It is mapped as 1 building covering about 6.5 acres (285,000 sq ft). Its power comes off the Ohio Valley grid (MISO (Midcontinent ISO)), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorOperator not recordedas mapped
Roof area6.5 ac1 building
Grid CO₂911 lbper MWh, RFCW region
Nearest plant2.6 miWaxdale

Location

This data centerOther data centersPower plants (colored by fuel)

CountyRacine County, Wisconsin
Coordinates42.67290, -87.89692
On OpenStreetMapway/1510420026

What powers Data center, Sturtevant

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Racine County

UtilityTypeGridBusiness rateIndustrial rate
Wisconsin Electric Power CoInvestor OwnedMISO (Midcontinent ISO)13.8¢9.3¢

Utilities that report serving Racine County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
WaxdaleNatural Gas12.1 MW2.6 mi
UW ParksideSolar2.3 MW2.8 mi
CreeSolar1.5 MW3.1 mi
Paris (WI)Natural Gas382 MW5.9 mi
Paris SolarSolar310 MW6.1 mi
Adams Road SolarSolar4.0 MW7.1 mi
Strawberry Creek Solar WI, LLCSolar6.0 MW8.4 mi
Caledonia Solar WI, LLCSolar6.0 MW9.3 mi
Pheasant Run Landfill Gas RecoveryBiomass8.8 MW9.7 mi
Raymond Solar WI, LLCSolar6.0 MW10.2 mi

The largest power plant within 50 miles is Elm Road Generating Station, a 1,403 MW coal plant 13 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, SturtevantOperator not recorded0.2 ac1.1 mi

More

Data centers in Wisconsin · Data centers in Racine County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me