DBT Data - Harrisonburg Center is a data center in Harrisonburg, Harrisonburg (city), Virginia. Its power comes off the Virginia/Carolinas grid, which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorOperator not recordedas mapped
Grid CO₂590 lbper MWh, SRVC region
Nearest plant0.6 miMount Clinton

Location

This data centerOther data centersPower plants (colored by fuel)

CountyHarrisonburg (city), Virginia
Coordinates38.46301, -78.85691
On OpenStreetMapway/876120402

What powers DBT Data - Harrisonburg Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Nearest power plants

PlantFuelCapacityDistance
Mount ClintonOil24.0 MW0.6 mi
Pleasant Valley (VA)Oil20.5 MW4.9 mi
Molson Coors Shenandoah BreweryBiomass1.4 MW12.2 mi
ElktonNatural Gas14.0 MW12.3 mi
MerckSolar2.1 MW12.8 mi
Prospect Power BESSBattery Storage150 MW14.0 mi
Caden Energix Endless Caverns, LLCSolar31.4 MW14.2 mi
Newport Hydro StationHydroelectric1.4 MW16.1 mi
Randolf SolarSolar3.2 MW21.8 mi
Mt. Jackson SolarSolar15.7 MW21.9 mi

The largest power plant within 50 miles is Tenaska Virginia Generating Station, a 1,011 MW natural gas plant 49 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Virginia · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me