DLI ONE data center, Columbus is a data center in Columbus, Muscogee County, Georgia. It is mapped as 1 building covering about 2.7 acres (116,000 sq ft). Its power comes off the Southeast grid (Southern Company), which runs on 55% natural gas, 20% nuclear and 15% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 8 Corporate Ridge Parkway, Columbus GA 31907 |
|---|---|
| County | Muscogee County, Georgia |
| Coordinates | 32.49827, -84.88347 |
| Website | dlione.net/ |
| On OpenStreetMap | way/958153769, way/958153770 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southeast grid region, and the county's largest utility is on the Southern Company grid. In 2023, the region's electricity was 55% natural gas, 20% nuclear, 15% coal and 4% solar.
Each megawatt-hour carried about 840 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southeast grid region (SRSO) in 2023, from eGRID. 257 TWh from 338 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Georgia Power Co | 11.7¢ | 7.1¢ |
| Flint Electric Membership Corp | 12.0¢ | 8.0¢ |
| Diverse Power Incorporated | 16.3¢ | 7.1¢ |
Utilities that report serving Muscogee County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Muscogee Public Works | Solar | 1.5 MW | 1.3 mi |
| North Highlands | Hydroelectric | 29.6 MW | 6.6 mi |
| Oliver Dam | Hydroelectric | 60.0 MW | 6.9 mi |
| Walton Discover Power Facility | Natural Gas | 103 MW | 9.5 mi |
| Talbot County Energy | Natural Gas | 726 MW | 12.8 mi |
| Goat Rock | Hydroelectric | 38.6 MW | 13.8 mi |
| H Allen Franklin Combined Cycle | Natural Gas | 1,996 MW | 14.6 mi |
| Fort Benning Solar Facility | Solar | 30.0 MW | 14.8 mi |
| Bartletts Ferry | Hydroelectric | 173 MW | 16.6 mi |
| Harris Shiloh | Solar | 2.1 MW | 23.4 mi |
The largest power plant within 50 miles is H Allen Franklin Combined Cycle, a 1,996 MW natural gas plant 15 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.