Google Jackson County Data Center

Google Jackson County Data Center is a data center run by Google LLC in Bridgeport, Jackson County, Alabama. Its power comes off the Tennessee Valley grid (Tennessee Valley Authority), which runs on 33% nuclear, 30% natural gas and 28% coal.

OperatorGoogle LLCas mapped
Grid CO₂895 lbper MWh, SRTV region
Nearest plant9.4 miNickajack

Location

This data centerOther data centersPower plants (colored by fuel)

CountyJackson County, Alabama
Coordinates34.91443, -85.74832
Opened2018 (as mapped)
Websitewww.google.com/about/datacenters/locations/jackson-county/
On OpenStreetMapway/714889192

What powers Google Jackson County Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Tennessee Valley grid region, and the county's largest utility is on the Tennessee Valley Authority grid. In 2023, the region's electricity was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric.

Each megawatt-hour carried about 895 lb of CO₂, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Jackson County

UtilityTypeGridBusiness rateIndustrial rate
Sand Mountain Electric CoopCooperativeTennessee Valley Authority13.6¢8.4¢
North Alabama Electric CoopCooperativeTennessee Valley Authority14.8¢5.0¢
City of Scottsboro - (AL)MunicipalTennessee Valley Authority11.9¢6.9¢

Utilities that report serving Jackson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
NickajackHydroelectric104 MW9.4 mi
BellefonteOil14.0 MW17.5 mi
Raccoon MountainHydroelectric1,714 MW22.6 mi
Chattanooga Metropolitan Airport SolarSolar2.5 MW31.5 mi
ChickamaugaHydroelectric160 MW32.1 mi
Chattooga GoreSolar2.4 MW33.4 mi
Elora SolarSolar150 MW35.0 mi
Tims FordHydroelectric45.7 MW35.8 mi
Volkswagen Solar SystemSolar7.6 MW37.4 mi
SR Marion, LLCSolar1.3 MW38.8 mi

The largest power plant within 50 miles is Sequoyah, a 2,441 MW nuclear plant 43 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Google data center, BridgeportGoogle6.6 ac0.1 mi

More

Data centers in Alabama · Data centers in Jackson County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me