HCA Information Technology & Services Data Center

HCA Information Technology & Services Data Center is a data center in Antioch, Davidson County, Tennessee. It is mapped as 1 building covering about 2.1 acres (93,000 sq ft). Its power comes off the Tennessee Valley grid (Tennessee Valley Authority), which runs on 33% nuclear, 30% natural gas and 28% coal.

OperatorOperator not recordedas mapped
Roof area2.1 ac1 building
Grid CO₂895 lbper MWh, SRTV region
Nearest plant8.6 miJ P Priest

Location

This data centerOther data centersPower plants (colored by fuel)

CountyDavidson County, Tennessee
Coordinates36.03292, -86.63775
On OpenStreetMapway/819981891, way/819981888

What powers HCA Information Technology & Services Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Tennessee Valley grid region, and the county's largest utility is on the Tennessee Valley Authority grid. In 2023, the region's electricity was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric.

Each megawatt-hour carried about 895 lb of CO₂, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Davidson County

UtilityTypeGridBusiness rateIndustrial rate
Nashville Electric ServiceMunicipalTennessee Valley Authority12.0¢7.6¢

Utilities that report serving Davidson County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
J P PriestHydroelectric28.0 MW8.6 mi
Vanderbilt University Power PlantNatural Gas18.7 MW12.1 mi
Opryland USANatural Gas4.5 MW12.7 mi
Music City Community SolarSolar1.6 MW16.1 mi
Old HickoryHydroelectric104 MW18.3 mi
MTSU Power Co-Gen PlantNatural Gas5.0 MW19.8 mi
Gallatin (TN)Coal1,918 MW23.6 mi
SR Christiana, LLCSolar3.3 MW27.6 mi
SR Bell BuckleSolar35.0 MW33.5 mi
SR HickmanSolar5.5 MW36.6 mi

The largest power plant within 50 miles is Gallatin (TN), a 1,918 MW coal plant 24 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Tennessee · Data centers in Davidson County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me