Iron City No. 1 Power Generator and Compute Center is a data center in Karthaus, Clearfield County, Pennsylvania. Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 3160 Paul Hoddman Road, Karthaus PA 16845 |
|---|---|
| County | Clearfield County, Pennsylvania |
| Coordinates | 41.14104, -78.09741 |
| On OpenStreetMap | node/13908533343 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.
Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| FirstEnergy Pennsylvania Electric Co | 15.2¢ | 8.9¢ |
| REA Energy Coop Inc | 12.5¢ | 11.3¢ |
Utilities that report serving Clearfield County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| UN-School House LLC | Solar | 20.0 MW | 13.0 mi |
| Shawville | Natural Gas | 632 MW | 14.9 mi |
| University Park Solar | Solar | 1.5 MW | 26.0 mi |
| East Campus Steam Plant | Natural Gas | 7.0 MW | 26.4 mi |
| West Campus Steam Plant | Natural Gas | 14.0 MW | 26.9 mi |
| Mingoville PV I | Solar | 3.0 MW | 27.1 mi |
| Mingoville PV II | Solar | 2.0 MW | 27.1 mi |
| Sandy Ridge Wind 2, LLC | Wind | 87.6 MW | 28.1 mi |
| CL-Viaduct LLC | Solar | 20.0 MW | 29.6 mi |
| Sandy Ridge Wind Farm | Wind | 50.0 MW | 30.1 mi |
The largest power plant within 50 miles is Shawville, a 632 MW natural gas plant 15 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.