MasterCard data center, O Fallon

MasterCard data center, O Fallon is a data center in O Fallon, St. Charles County, Missouri. It is mapped as 1 building covering about 1.3 acres (56,000 sq ft). Its power comes off the Mid-Mississippi grid (MISO (Midcontinent ISO)), which runs on 51% coal, 17% natural gas and 16% nuclear.

OperatorMasterCardas mapped
Roof area1.3 ac1 building
Grid CO₂1,238 lbper MWh, SRMW region
Nearest plant6.6 miO'Fallon Renewable Energy…

Location

This data centerOther data centersPower plants (colored by fuel)

CountySt. Charles County, Missouri
Coordinates38.74631, -90.74534
On OpenStreetMapway/1573443428

What powers MasterCard data center, O Fallon

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Mississippi grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 51% coal, 17% natural gas, 16% nuclear and 13% wind.

Each megawatt-hour carried about 1,238 lb of CO₂, 62% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 51%Natural Gas 17%Nuclear 16%Wind 13%

Share of electricity generated in EPA's Mid-Mississippi grid region (SRMW) in 2023, from eGRID. 106 TWh from 243 plants.

Utilities that serve St. Charles County

UtilityTypeGridBusiness rateIndustrial rate
Union Electric Co - (MO)Investor OwnedMISO (Midcontinent ISO)9.7¢7.6¢
Cuivre River Electric Coop IncCooperativeAssociated Electric Cooperative, Inc11.6¢8.1¢

Utilities that report serving St. Charles County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
O'Fallon Renewable Energy CenterSolar4.5 MW6.6 mi
LabadieCoal2,389 MW13.7 mi
Winfield SolarSolar150 MW19.8 mi
Blue Bird Solar, LLCSolar139 MW23.4 mi
Split Rail Solar Energy LLCSolar300 MW27.1 mi
SiouxCoal1,099 MW27.1 mi
Renewable Energy Center at BJHSolar1.6 MW27.4 mi
IKEA St. Louis 410Solar1.0 MW28.0 mi
Anheuser-Busch St LouisNatural Gas26.1 MW30.6 mi
Southwestern Bell TelephoneOil17.2 MW30.9 mi

The largest power plant within 50 miles is Labadie, a 2,389 MW coal plant 14 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Missouri · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me