Minnesota Gateway Data Center is a data center in Minneapolis, Hennepin County, Minnesota. It is mapped as 1 building covering about 2.0 acres (87,000 sq ft). Its power comes off the Upper Midwest grid (MISO (Midcontinent ISO)), which runs on 38% wind, 35% coal and 13% natural gas.
This data centerOther data centersPower plants (colored by fuel)
| Address | 511 11th Avenue South, Minneapolis MN 55415 |
|---|---|
| County | Hennepin County, Minnesota |
| Coordinates | 44.97142, -93.25484 |
| On OpenStreetMap | way/63619642 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% wind, 35% coal, 13% natural gas and 8% nuclear.
Each megawatt-hour carried about 920 lb of CO₂, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Northern States Power Co - Minnesota | 12.8¢ | 9.7¢ |
| Connexus Energy | 10.6¢ | 7.9¢ |
| Wright-Hennepin Coop Elec Assn | 11.6¢ | 10.2¢ |
| Minnesota Valley Electric Coop | 10.5¢ | — |
| City of Elk River | 15.2¢ | 11.8¢ |
| City of Anoka | 11.9¢ | 12.1¢ |
Utilities that report serving Hennepin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| SAF Hydroelectric LLC | Hydroelectric | 9.6 MW | 0.6 mi |
| Southeast Steam Plant | Natural Gas | 13.0 MW | 0.7 mi |
| Hennepin Island | Hydroelectric | 13.7 MW | 0.8 mi |
| Univ Minnesota CHP Plant | Natural Gas | 21.0 MW | 0.8 mi |
| Covanta Hennepin Energy | Biomass | 39.5 MW | 1.5 mi |
| Riverside (MN) | Natural Gas | 586 MW | 3.5 mi |
| Twin Cities Hydro LLC | Hydroelectric | 18.0 MW | 4.7 mi |
| St. Paul Intl Airport Red & Blue Parking | Solar | 3.2 MW | 6.7 mi |
| MNDOT Standby Generation | Oil | 2.0 MW | 7.4 mi |
| High Bridge | Natural Gas | 644 MW | 7.5 mi |
The largest power plant within 50 miles is Sherburne County, a 1,704 MW coal plant 42 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Advanced Operations Center | 0.5 ac | 1.5 mi |
| Lumen Minneapolis 3 | 0.3 ac | 1.6 mi |
| Verizon data center, 1200 North Washington Avenue, Minneapolis | 1.2 ac | 1.9 mi |
Data centers in Minnesota · Data centers in Hennepin County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.