Minnesota Gateway Data Center is a data center in Minneapolis, Hennepin County, Minnesota. It is mapped as 1 building covering about 2.0 acres (87,000 sq ft). Its power comes off the Upper Midwest grid (MISO (Midcontinent ISO)), which runs on 38% wind, 35% coal and 13% natural gas.

OperatorOperator not recordedas mapped
Roof area2.0 ac1 building
Grid CO₂920 lbper MWh, MROW region
Nearest plant0.6 miSAF Hydroelectric LLC

Location

This data centerOther data centersPower plants (colored by fuel)

Address511 11th Avenue South, Minneapolis MN 55415
CountyHennepin County, Minnesota
Coordinates44.97142, -93.25484
On OpenStreetMapway/63619642

What powers Minnesota Gateway Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% wind, 35% coal, 13% natural gas and 8% nuclear.

Each megawatt-hour carried about 920 lb of CO₂, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

Utilities that serve Hennepin County

UtilityTypeGridBusiness rateIndustrial rate
Northern States Power Co - MinnesotaInvestor OwnedMISO (Midcontinent ISO)12.8¢9.7¢
Connexus EnergyCooperativeMISO (Midcontinent ISO)10.6¢7.9¢
Wright-Hennepin Coop Elec AssnCooperativeMISO (Midcontinent ISO)11.6¢10.2¢
Minnesota Valley Electric CoopCooperativeMISO (Midcontinent ISO)10.5¢—
City of Elk RiverMunicipalMISO (Midcontinent ISO)15.2¢11.8¢
City of AnokaMunicipalMISO (Midcontinent ISO)11.9¢12.1¢

Utilities that report serving Hennepin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
SAF Hydroelectric LLCHydroelectric9.6 MW0.6 mi
Southeast Steam PlantNatural Gas13.0 MW0.7 mi
Hennepin IslandHydroelectric13.7 MW0.8 mi
Univ Minnesota CHP PlantNatural Gas21.0 MW0.8 mi
Covanta Hennepin EnergyBiomass39.5 MW1.5 mi
Riverside (MN)Natural Gas586 MW3.5 mi
Twin Cities Hydro LLCHydroelectric18.0 MW4.7 mi
St. Paul Intl Airport Red & Blue ParkingSolar3.2 MW6.7 mi
MNDOT Standby GenerationOil2.0 MW7.4 mi
High BridgeNatural Gas644 MW7.5 mi

The largest power plant within 50 miles is Sherburne County, a 1,704 MW coal plant 42 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Advanced Operations CenterUniversity of Minnesota0.5 ac1.5 mi
Lumen Minneapolis 3Lumen Technologies0.3 ac1.6 mi
Verizon data center, 1200 North Washington Avenue, MinneapolisVerizon1.2 ac1.9 mi

More

Data centers in Minnesota · Data centers in Hennepin County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.