SU Green Data Center is a data center run by Syracuse University in Onondaga, Onondaga County, New York. It is mapped as 1 building covering about 12,100 sq ft. Its power comes off the Upstate New York grid (New York ISO), which runs on 33% hydroelectric, 32% nuclear and 25% natural gas.
This data centerOther data centersPower plants (colored by fuel)
| Address | 623 Skytop Road, Onondaga NY 13210 |
|---|---|
| County | Onondaga County, New York |
| Coordinates | 43.01212, -76.11591 |
| On OpenStreetMap | way/930043986 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upstate New York grid region, and the county's largest utility is on the New York ISO grid. In 2023, the region's electricity was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind.
Each megawatt-hour carried about 241 lb of CO₂, 69% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Niagara Mohawk Power Corp. | 10.4¢ | 6.0¢ |
| New York State Elec & Gas Corp | 15.0¢ | 12.5¢ |
| Village of Solvay - (NY) | 6.0¢ | 5.1¢ |
Utilities that report serving Onondaga County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Onondaga County Resource Recovery | Biomass | 39.5 MW | 0.5 mi |
| Onondaga County- Jamesville | Solar | 2.0 MW | 3.1 mi |
| Carr Street Generating Station | Natural Gas | 123 MW | 3.8 mi |
| Sunvestment Energy Group NY 63 LLC | Solar | 2.0 MW | 4.4 mi |
| Manilus | Solar | 4.5 MW | 5.2 mi |
| Clemons Road Solar | Solar | 2.8 MW | 6.4 mi |
| USNY - Geddes | Solar | 3.3 MW | 6.4 mi |
| CH Resources Syracuse | Natural Gas | 103 MW | 6.7 mi |
| Manlius East | Solar | 5.0 MW | 7.4 mi |
| Manlius West | Solar | 5.0 MW | 7.4 mi |
The largest power plant within 50 miles is Nine Mile Point Nuclear Station, a 1,901 MW nuclear plant 38 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.